首页> 外文期刊>Hydrotechnical Construction >ASSESSMENT OF CYCLIC AND ASYNCHRONOUS RIVER FLOW PATTERNS OF THE ANGARA - YENISEI AND VOLGA-KAMA CASCADES AS A CONDITION FOR A POSSIBLE HHP OPERATION USING A COMPENSATED ENERGY GENERATION MODE
【24h】

ASSESSMENT OF CYCLIC AND ASYNCHRONOUS RIVER FLOW PATTERNS OF THE ANGARA - YENISEI AND VOLGA-KAMA CASCADES AS A CONDITION FOR A POSSIBLE HHP OPERATION USING A COMPENSATED ENERGY GENERATION MODE

机译:Angara - Yenisei和Volga-Kama Cascades对循环和异步河流模式的评估作为使用补偿能量产生模式实现HHP操作的条件

获取原文
获取原文并翻译 | 示例
           

摘要

The assessment of cyclic river flow fluctuations of the Angara – Yenisei and Volga – Kama cascades was performed to reveal the streamflow variation patterns of the Angara, Yenisei, Volga, and Kama rivers, which can be further used to optimize the operating conditions of the hydroelectric power plants located within these cascades.
机译:对Angara - Yenisei和Volga - Kama级联的循环河流流动的评估揭示了Angara,Yenisei,Volga和Kama Rivers的流出变化模式,可以进一步用于优化水电的操作条件电厂位于这些级联内。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号