...
首页> 外文期刊>Hydrotechnical Construction >CONDITION OF THE CONCRETE DAM FOR THE TOKTOGUL HYDROELECTRIC PLANT AFTER 25 YEARS OF SERVICE
【24h】

CONDITION OF THE CONCRETE DAM FOR THE TOKTOGUL HYDROELECTRIC PLANT AFTER 25 YEARS OF SERVICE

机译:25年服役后的水力发电站混凝土坝的状况

获取原文
获取原文并翻译 | 示例
           

摘要

The Toktogul hydroproject is located in a narrow rocky gorge with nearly vertical banks on the Naryn River in a 9-point-earthquake zone. The rocks in the region of the hydroproject have a folded geologic structure. Due to the high seismicity of the region and the geologic-engineering conditions, the requirement for high structure reliability was promoted, above all. in selecting the type of dam. This dictated the need to create a surcharge on the lateral sections of the foundation bed, and also to accept massive construction of the upper part of the dam to guarantee its stability when lumps of rock collapse from above and under the action of water, which may result from the collapse of significant vol nines of rock into the reservoir. The detail design for construction of the dam was developed by the S. Ya. Zhuk Scientific-Research Institute for Design and Exploration (SRIDE).
机译:托克托古尔(Toktogul)水利工程位于狭窄的岩石峡谷中,在9点地震带的纳林河上几乎是垂直的河岸。水利工程区域内的岩石具有折叠的地质结构。由于该地区的高地震活动性和地质工程条件,特别是对高结构可靠性的要求得到了提高。在选择水坝的类型。这就要求有必要在基床的侧向部分上增加附加费,并且还需要接受大坝上部的大规模建造,以保证当大块的岩石从上方和在水的作用下倒塌时其稳定性。是由于大量的岩石撞击到储层中而导致的。大坝的详细设计由S. Ya开发。朱克科学设计研究院(SRIDE)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号