GEOLOGIC-ENGINEERING GROUNDS FOR THE LAYOUT SOLUTIONS OF THE AUZHIGERSK HYDROELECTRIC POWER PLANT

机译:AUZHIGERSK水力发电厂布局方案的地质工程地面

获取原文
获取原文并翻译 | 示例
           

摘要

Construction of the series of two diversion-type Lower Cherek hydroelectric power plants each with a rated capacity of 60 MW has been in progress since 1992 in conformity with the "Program for the development of an electric-power base in the Kabardino-Balkar Republic in the period to 2010" and the Federal Goal Program "Fuel and energy." Construction of basic structures of the lower hydroelectric plant in the Aushigersk series on the Cherek River was begun in 1994. More than 85% of the excavation volume, approximately 80% of the fill volume, and about 75% of the volume of concrete work had been completed on the Aushigersk hydroelectric power plant by the start of 2000; the metallic conduit and spiral cases of the generating sets have been assembled in the powerhouse. Construction of the open diversion is now basically complete.
机译:自1992年以来,根据“喀巴迪诺-巴尔卡尔共和国电力基地开发计划”,两座分流式下Cherek水力发电厂系列的建设已于1992年开始进行。到2010年”和联邦目标计划“燃料与能源”。 1994年开始在Cherek河上建造Aushigersk系列下层水力发电厂的基本结构。开挖量的85%以上,填土量的80%和混凝土工程量的75%在2000年初完成了对Aushigersk水电站的建设;发电机组的金属导管和螺旋箱已组装在动力室中。公开改道的建设现已基本完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号