...
首页> 外文期刊>Hydrotechnical Construction >GEOLOGIC-ENGINEERING SURVEYS FOR THE REPAIR AND RECONSTRUCTION OF WATER-DEVELOPMENT WORKS
【24h】

GEOLOGIC-ENGINEERING SURVEYS FOR THE REPAIR AND RECONSTRUCTION OF WATER-DEVELOPMENT WORKS

机译:修复和重建水利工程的地质工程学调查

获取原文
获取原文并翻译 | 示例
           

摘要

Causes of Dam Repair. A significant part of dams, like the other structures that are component parts of hydroprojects, require repair and/or reconstruction. Processes resulting in appreciable changes in the state and properties of soils in the foundation bed and in various elements of dams, and their unacceptable deformations, which give rise to the need for repair of water-development works, may be subdivided into two groups (Table 1). Natural processes, which are manifested under extremal conditions, for example, during floods, the probability of the passage of which is lower than the calculated value, or during earthquakes with an intensity not previously noted in the region in question are classed with the first group. Processes of technogenic origin, which develop as a result of the force and chemical effects of water and filtration, as well as manifestations of compression, shear, or tension in the foundation, abutments, or in the body of the structure belong to the second group. Processes resulting from military and terrorist activities, and also sabotage, are also classed with this group.
机译:大坝维修的原因。与作为水利工程组成部分的其他建筑物一样,大坝的很大一部分也需要维修和/或重建。导致基床和大坝各要素土壤状态和性质发生明显变化的过程及其不可接受的变形(这些变形导致需要修复水开发工程)可分为两类(表1)。在极端情况下表现出的自然过程,例如在洪水通过的概率低于计算值的洪水期间,或者在有关区域先前没有注意到的强度的地震期间,被归为第一类。由于水和过滤的作用力和化学作用以及基础,桥台或结构主体中的压缩,剪切或拉紧的表现而发展的技术起源过程属于第二类。军事和恐怖活动以及破坏活动引起的进程也归入这一类。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号