...
【24h】

Regulation

机译:

获取原文
获取原文并翻译 | 示例
           

摘要

The Renewable Energy Association (REA) has called for a shake-up of Ofgem's green priorities. "The REA feels that Ofgem's statutory duties must be amended to make facilitation of the government's environmental targets an overriding objective," said Gaynor Hartnell, head of renewable power at the REA. The REA's comments were prompted by a new Ofgem report~* arguing that it is satisfactorily addressing sustainability within the framework of its current statutory duties, in reference to a recent report by the Sustainable Development Commission (SDC) (see issue 163). However, Hartnell and others have issues with some of the details of Ofgem's own assessment. She says: "For example, the Commission recommends Ofgem ensures that any proposals to change transmission charges don't disadvantage generators connected to the distribution network. But Ofgem favors doing just that. It would like to see a gross charging regime. This would be a very unfair way of charging renewable generators. It would make connecting to a distribution network as appealing as buying a ticket for the whole train journey, when only boarding at the penultimate station."
机译:可再生能源协会(REA)呼吁对Ofgem的绿色优先事项进行调整。 REA可再生能源主管盖诺·哈特内尔(Gaynor Hartnell)表示:“ REA认为必须修改Ofgem的法定职责,以简化政府的环境目标成为首要目标。” REA的评论是由Ofgem的一份新报告所引起的,该报告称*参照可持续发展委员会(SDC)的最新报告,正在其现行法定职责的范围内令人满意地解决了可持续性问题(见第163期)。但是,Hartnell和其他人对Ofgem自己评估的某些细节有疑问。她说:“例如,委员会建议Ofgem确保任何更改传输费的提议都不会不利于连接到配电网的发电机。但是Ofgem赞成这样做。它希望看到总收费制度。这就是这是一种非常不公平的为可再生发电机充电的方式。如果只在倒数第二站上车,那么连接到配电网就像购买火车全程票一样具有吸引力。”

著录项

  • 来源
    《Power UK》 |2007年第165期|p.35|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 电工技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号