...
首页> 外文期刊>Power UK >Ofgem opts for one year incentive extension of incentive scheme
【24h】

Ofgem opts for one year incentive extension of incentive scheme

机译:Ofgem选择将激励计划的激励期限延长一年

获取原文
获取原文并翻译 | 示例
           

摘要

Ofgem has opted to extend NGC's system operator incentive scheme by one year rather than introduce more radical changes before the advent of British wide transmission and trading arrangements (Betta) next year. The current 'shallow' system operator scheme, which rewards NGC for running the transmission system efficiently, will be extended in almost the exact same form for 12 months from April (see table). According to a new document,. NGC has been finding it increasingly hard to reap the maximum benefit from its incentive scheme. In 2002/3 it received just over £48m from the scheme - less than the maximum possible. And Ofgem reckons this current year's performance will see NGC's reward diminish further.
机译:Ofgem选择将NGC的系统运营商激励计划延长一年,而不是在明年英国广泛的传输和交易安排(Betta)出现之前引入更大的变化。当前的“浅层”系统运营商计划将奖励NGC有效运行传输系统,该计划将从4月开始以几乎完全相同的形式延长至12月(见表)。根据新文件。 NGC越来越难以从其激励计划中获得最大收益。在2002/3年度,它从该计划中获得了超过4,800万英镑的资助-少于可能的最高金额。 Ofgem认为,今年的业绩将使NGC的回报进一步减少。

著录项

  • 来源
    《Power UK》 |2004年第121期|p.27-28|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 电工技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号