Wind to cost £700 million pa in constraints

机译:风力发电每年将耗资7亿英镑

获取原文
获取原文并翻译 | 示例
           

摘要

The boom in wind energy projects could lead to an annual transmission constraints bill of £700million by 2007/8, according to estimates derived from new projections by National Grid Transco. In a recent consultation document, NGT predicts that if all companies that want transmission agreements are given firm access rights before the start of Betta (British Electricity Transmission and Trading Arrangements) next year then large bottlenecks in the transmission system could occur. NGT has consulted on four possible ways of managing the level of constraints on the system. The so-called Option Two route, which is favoured by most respondents to the paper and would also honour existing transmission agreements, is set to result in the highest level of constraint costs.
机译:根据国家电网公司的最新预测,到2007/8年度,风能项目的蓬勃发展可能导致每年7亿英镑的输电限制法案。 NGT在最近的一份咨询文件中预测,如果所有希望进行传输协议的公司在明年Betta(英国电力传输和贸易安排)开始之前获得了牢固的访问权,那么传输系统中可能会出现很大的瓶颈。 NGT已就管理系统约束级别的四种可能方式进行了协商。所谓的“方案二”路线将导致最高的约束成本水平,这是该论文的大多数答复者所青睐的,也将兑现现有的传输协议。

著录项

  • 来源
    《Power UK》 |2004年第124期|p.18-22|共5页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 电工技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号