首页> 外文期刊>Public roads >Breaking Down Project Complexities
【24h】

Breaking Down Project Complexities

机译:打破项目复杂性

获取原文
获取原文并翻译 | 示例
           

摘要

The Washington State Department of Transportation (WSDOT) is working with a diverse set of partners and stakeholders as it replaces and reconfigures the aging Seattle Multimodal Ferry Terminal at Colman Dock—all while the terminal remains operational. This ferry terminal is the largest in the system, providing two service routes to more than 8.5 million people annually. The facility also serves two passenger-only routes operated by King County. Pedestrians and bicyclists use the terminal, as well as several types of vehicles, including cars, high-occupancy vehicles, and transit.
机译:华盛顿州运输部(WSDOT)正在与各种各样的合作伙伴和利益相关方合作,以替换并重新配置Colman Dock中老化的西雅图多式联运轮渡码头-在该码头仍在运行的同时。这个渡轮码头是系统中最大的渡轮码头,每年为850万人提供两条服务路线。该设施还为金县运营的两条仅载客路线服务。行人和骑自行车的人使用终点站以及几种类型的车辆,包括汽车,高占用率车辆和公交车。

著录项

  • 来源
    《Public roads》 |2017年第2期|10-13|共4页
  • 作者

    Carlos E Figueroa; Amy Nagel;

  • 作者单位

    Department of Transportation's Volpe National Transportation Systems Center;

    Department of Transportation's Volpe National Transportation Systems Center;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号