首页> 外文期刊>Reliability Engineering & System Safety >Quantification of Margins and Uncertainties
【24h】

Quantification of Margins and Uncertainties

机译:保证金和不确定性的量化

获取原文
获取原文并翻译 | 示例
           

摘要

In 1992, the United States began a unilateral moratorium on the testing of nuclear weapons. Prior to this moratorium, data on the performance of nuclear weapons were obtained through underground tests, and confidence in the reliability of stockpiled weapons relied heavily on the expert judgment of weapons designers who had significant experience with successful tests. Specifically, all aspects of nuclear weapon performance were not verified on the basis of test data. Rather, test data were used as part of a science, technology, and engineering program to calibrate models used to predict weapon performance.
机译:1992年,美国开始单方面暂停试验核武器。在此暂停之前,通过地下试验获得了有关核武器性能的数据,并且对储备武器的可靠性的信心在很大程度上依赖于具有成功试验经验的武器设计者的专家判断。具体而言,没有根据试验数据对核武器性能的所有方面进行核实。相反,测试数据被用作科学,技术和工程计划的一部分,以校准用于预测武器性能的模型。

著录项

  • 来源
    《Reliability Engineering & System Safety》 |2011年第9期|p.959-964|共6页
  • 作者

    Jon C. Helton; Martin Pilch;

  • 作者单位

    Department of Mathematics and Statistics,Arizona State University, Tempe, AZ 85287-1804, USA;

    Dept. 1514, MS 0828, Sandia National Laboratories,Albuquerque, NM 87185-0828, USA;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号