Nearly seven miles of Rte. 5 in Camden County, Mo., is the largest grading project in the history of the Missouri Department of Transportation (Mo-DOT). The road realignment project included construction of four major bridges, two interchanges, grading and extensive drainage systems, along with excavation of more than 7 million cu yd of soil and rock. Topography and the geology along the alignment challenged the contractor by affecting access to jobsites. These challenges had to be overcome to accommodate the timely delivery of concrete pipe from Cretex Concrete Products Midwest Inc. Some of the installation sites were so difficult to access that the contractor had to bulldoze temporary roads to get delivery trucks to the jobsites. Over two miles of reinforced concrete pipe ranging from 12 to 90 in. in diameter under various fill heights and 1,350 ft of boxes were shipped to the project. The MoDOT pipe design included 42-in. to 90-in.-diam.-thick wall reinforced concrete pipe that would carry fill heights into the 100-ft range.
机译:Rte近七英里。密苏里州卡姆登县的第5个项目是密苏里州交通运输部(Mo-DOT)历史上最大的分级项目。道路改建项目包括建造四座主要桥梁,两座立交桥,平地和广泛的排水系统,以及开挖超过700万立方米的土石方。路线沿线的地形和地质对承包者造成了影响,影响了他们进入工地的通道。为了适应Cretex Concrete Products Midwest Inc.的混凝土管道的及时交付,必须克服这些挑战。一些安装地点非常难以通行,以至于承包商不得不推翻临时道路以将运输卡车运往现场。在不同的填充高度下,直径超过12英寸至90英寸的钢筋混凝土管超过了2英里,并向该项目运送了1,350英尺的盒子。 MoDOT管道设计包括42英寸。到90英寸直径的壁厚钢筋混凝土管,其填充高度可达到100英尺。

著录项

  • 来源
    《Roads & bridges》 |2008年第10期|p.44|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 公路运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号