...
首页> 外文期刊>Roads & bridges >Double the work
【24h】

Double the work

机译:工作加倍

获取原文
获取原文并翻译 | 示例
           

摘要

Glenn O. Hawbaker Inc. out of State College, Penn., is committed to continually improving safety and efficiency around their road building, site development and heavy construction jobsites. PowerTilt turned out to be just the tool they were looking for. Prior to using PowerTilt, Glenn O. Hawbaker faced two challenges on the jobsite. For starters, they were using large and expensive special-purpose excavators for their grading and sloping work and had to move these machines in and out of jobsites frequently. This was a major expense and logistical hassle for Hawbaker.
机译:来自宾夕法尼亚州立大学的Glenn O. Hawbaker Inc.致力于在道路建设,场地开发和重型建筑工地周围不断提高安全性和效率。事实证明PowerTilt只是他们正在寻找的工具。在使用PowerTilt之前,Glenn O. Hawbaker在工作现场面临两个挑战。首先,他们使用大型且昂贵的专用挖掘机进行坡度和坡度工作,并且不得不频繁地将这些机器进出作业现场。这是霍贝克的主要费用和后勤麻烦。

著录项

  • 来源
    《Roads & bridges》 |2007年第10期|p.76|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 公路运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号