...
首页> 外文期刊>Scientific Computing & Instrumentation >Analytical & Mathematical Computation
【24h】

Analytical & Mathematical Computation

机译:分析与数学计算

获取原文
获取原文并翻译 | 示例
           

摘要

With four power module's installed, adding resistance to the neutral line caused the modules to latch-up. Though this behavior was not a problem because the amount of resistance required to induce latch-up far exceeded the value that would occur in practice, it required an explanation and an assurance that it would not occur under more realistic conditions. After some investigation, they found that if a resistance is added to the neutral line of a modular three phase power system, the circuit will trip when configured as "3n+1," that is, with four, seven or 10 modules.
机译:在安装了四个电源模块的情况下,中性线的电阻增加导致模块闩锁。尽管此行为不是问题,因为引起闩锁所需的电阻量远远超过了实际发生的值,但它需要进行解释并保证在更实际的条件下不会发生。经过一番调查,他们发现,如果将电阻添加到模块化三相电源系统的中性线,则当配置为“ 3n + 1”(即具有四个,七个或十个模块)时,电路将跳闸。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号