...
首页> 外文期刊>Space news >NASA Seeks Interim Second Stage for First SLS Missions
【24h】

NASA Seeks Interim Second Stage for First SLS Missions

机译:美国宇航局寻求第二阶段的SLS首次任务

获取原文
获取原文并翻译 | 示例
           

摘要

Lacking the funds to complete a flight-ready J-2X upper-stage engine before 2021, NASA will procure a commercial cryogenic rocket engine for the first two flights of die Space Launch System (SLS), the agency said. "The 70 metric-ton SLS configuration will include an interim cryogenic propulsion stage to enable the Orion trans-lunar mission," Jennifer Stanfield, a NASA spokeswoman at the Marshall Space Flight Center in Huntsville, Ala., said in a Nov. 22 email. "Acquisition planning is in progress to evaluate the various commercial options available to NASA." She would not say which systems NASA was considering, but noted that "affordability is one of the driving objectives of SLS." The only U.S. cryogenic upperstage engine in service is the RL10 that Pratt & Whitney Rocket-dyne builds for United Launch Alliance's Atlas 5 and Delta 4 rockets.
机译:美国宇航局表示,由于缺乏资金来在2021年之前完成可用于飞行的J-2X上层发动机的研发,美国宇航局将为太空发射系统(SLS)的前两次飞行采购商用低温火箭发动机。阿拉巴马州亨茨维尔马歇尔太空飞行中心的美国宇航局发言人詹妮弗·斯坦菲尔德在11月22日的电子邮件中说:“ 70公吨的SLS配置将包括一个临时的低温推进阶段,以实现猎户座跨月任务。” 。 “采购计划正在进行中,以评估可供NASA使用的各种商业选择。”她不会说NASA正在考虑使用哪个系统,但她指出“负担能力是SLS的驱动目标之一”。唯一在役的美国低温上层发动机是普惠公司的火箭达因公司为联合发射联盟的阿特拉斯5号和三角洲4型火箭制造的RL10。

著录项

  • 来源
    《Space news》 |2011年第46期|p.12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号