...
首页> 外文期刊>The Motor ship >LNG bunkering recommendation
【24h】

LNG bunkering recommendation

机译:液化天然气加油建议

获取原文
获取原文并翻译 | 示例
           

摘要

DNV GL has launched a Recommended Practice on LNG bunkering for suppliers and operators. The classification society says that although the industry has gained significant experience over the years there is as yet no process for developing a standard required infrastructure for bunkering. Currently, 83 LNG fuelled ships are in operation or on order worldwide ranging from passenger ferries to tankers and platform supply vessels. The ISO draft guideline published in June 2013 suggests a list of 24 requirements on how bunkering should work but Lars Fitter Blikom, LNG director, DNV GL, says that the new recommendation will help put them into practice.
机译:DNV GL已针对供应商和运营商启动了有关LNG加注的推荐做法。船级社表示,尽管多年来在该行业积累了丰富的经验,但尚无开发标准所需的加油基础设施的过程。目前,全球有83艘LNG燃料船正在运营或订购,从客运轮船到油轮和平台供应船。 2013年6月发布的ISO准则草案提出了有关加油应如何工作的24条要求的清单,但DNV GL的液化天然气主管Lars Fitter Blikom表示,新建议将有助于将其付诸实践。

著录项

  • 来源
    《The Motor ship》 |2013年第11期|7-7|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号