...
首页> 外文期刊>The Railway Magazine >Llangollen Railway services steam back to Carrog
【24h】

Llangollen Railway services steam back to Carrog

机译:Llangollen铁路服务蒸汽回到载体

获取原文
获取原文并翻译 | 示例
           

摘要

GWR-2-8-0 No. 3802 departed Llangollen at 10.30 on Saturday, August 21 with the Denbighshire line's first steam-hauled public train since October 1,2020 -an occasion that also marked the return of trains to Carrog, writes Gareth Evans. As previously reported, services have progressively resumed along the Dee Valley after the collapse of the Llangollen Railway pic - operations by the Llangollen Railway Trust were extended from Berwyn to Glyndyfrdwy on August 13.
机译:GWR-2-8-0 No.3802在8月21日在10月21日离开Llangollen,8月21日与Denbighshire Line的第一条蒸汽牵引的公共火车自10月1日以来,它也标志着Rantog的retog,Gareth Evans写道 。 如前所述,在Llangollen铁路PIC的崩溃之后,服务已经沿着Dee山谷逐步恢复 - Llangollen铁路信托在8月13日从Berwyn延伸到GlyndyFrdwy。

著录项

  • 来源
    《The Railway Magazine》 |2021年第1446期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号