首页> 外文期刊>Thermal engineering >Modernization of the Power Unit no. 5 of the Razdan TPP with a Gas-Turbine Topping According to a Discharge Arrangement
【24h】

Modernization of the Power Unit no. 5 of the Razdan TPP with a Gas-Turbine Topping According to a Discharge Arrangement

机译:动力单元现代化Razdan TPP的5个具有根据排放装置布置的燃气轮机顶部

获取原文
获取原文并翻译 | 示例
           

摘要

We present the main reasons for reconstruction of the standard 300 MW power unit with K-300-240 steam turbine into the combined-cycle installation using an Alstom gas-turbine unit with an installed capacity of 180 MW. Implementation of the project makes it possible to increase the unit capacity of the power unit, without hardly any changes in existing infrastructures, most efficiently use organic fuel, as well as reduce hazardous emissions under combined (steam-gas) and independent (using steam cycle) modes of operation.
机译:我们介绍了使用带有180 MW装机容量的阿尔斯通燃气轮机将带有K-300-240汽轮机的标准300 MW发电机组改造为联合循环装置的主要原因。该项目的实施使得有可能在不对现有基础设施进行任何改动的情况下增加动力单元的单位容量,最有效地使用有机燃料,并减少联合(蒸汽-蒸汽)和独立(使用蒸汽循环)下的有害排放)的操作模式。

著录项

  • 来源
    《Thermal engineering》 |2012年第2期|p.125-127|共3页
  • 作者单位

    ZAO ArmRosgazprom, Tbilisskoe shosse 43, Yerevan, 0091 Armenia;

    ZAO ArmRosgazprom, Tbilisskoe shosse 43, Yerevan, 0091 Armenia;

    ZAO ArmRosgazprom, Tbilisskoe shosse 43, Yerevan, 0091 Armenia;

    ZAO ArmRosgazprom, Tbilisskoe shosse 43, Yerevan, 0091 Armenia;

    ZAO ArmRosgazprom, Tbilisskoe shosse 43, Yerevan, 0091 Armenia;

    ZAO ArmRosgazprom, Tbilisskoe shosse 43, Yerevan, 0091 Armenia;

    ZAO ArmRosgazprom, Tbilisskoe shosse 43, Yerevan, 0091 Armenia;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号