首页> 外文期刊>Transport Engineering in Australia >The Daventry PRT Scheme:The solution for smaller towns?
【24h】

The Daventry PRT Scheme:The solution for smaller towns?

机译:达文垂PRT计划:小城镇的解决方案?

获取原文
获取原文并翻译 | 示例
           

摘要

Daventry is scheduled to grow from a population of 23,000 to 40,000 by 2021, and sustainable growth is the aim. A radical approach is needed to solving the problem of car dependence. Like other small towns, conventional public transport solutions are under-performing. PRT (personal rapid transport) offers the attributes of taxis, but with minimum waiting time and might be faster than cars in some cases. Daventry District Council commissioned Sinclair Knight Merz (SKM) to undertake a two-phase study during 2007 reviewing the PRT concept. This paper summarises the technical work and the key,findings, including the identification of a possible pilot scheme.
机译:达文垂计划到2021年将人口从23,000增长到40,000,可持续发展是我们的目标。需要一种根本的方法来解决汽车依赖性问题。与其他小镇一样,传统的公共交通解决方案也表现不佳。 PRT(个人快速运输)具有出租车的特性,但等待时间最短,在某些情况下可能比汽车快。达文垂区议会委托辛克莱·奈特·默兹(Sinclair Knight Merz)(SKM)在2007年进行了两阶段的研究,以审查PRT概念。本文总结了技术工作和关键发现,包括确定可能的试验计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号