...
首页> 外文期刊>Underground Construction >Overcoming Pipebursting Challenges - On Time, Under Budget
【24h】

Overcoming Pipebursting Challenges - On Time, Under Budget

机译:克服管道破裂的挑战-在预算内按时完成

获取原文
获取原文并翻译 | 示例
           

摘要

When the small Oregon town of North Plains needed to upgrade stormwater and sanitary sewer systems to accommodate growth, plans were developed to combine these improvements with a street project for the community's major thoroughfare. Included in the project was replacing 1,150 feet of old 8-inch diameter PVC main with new HDPE SDR 17 pipe in diameters up to 18 inches to increase capacity needed for new housing and other developments.
机译:当俄勒冈州北部平原小镇需要升级雨水和污水处理系统以适应增长时,便制定了计划,将这些改进措施与社区主要道路的街道项目结合起来。该项目包括用直径最大为18英寸的新HDPE SDR 17管替换1,150英尺的旧8英寸直径的PVC主管,以增加新房屋和其他开发所需的容量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号