首页> 外文期刊>Research journal of applied science, engineering and technology >Assembly Line Efficiency Measurement and Line Balancing-A Case Study on Automobile Cluster Assembly Line
【24h】

Assembly Line Efficiency Measurement and Line Balancing-A Case Study on Automobile Cluster Assembly Line

机译:装配线效率的测量与生产线平衡-以汽车整车装配线为例

获取原文
           

摘要

Factors which affect the performance of assembly lines are difficult to be assessed and solved by mathematical model. This study attempts a practical solution to the stochastic Automobile Instrument cluster assembly line balancing problem. The factors influencing the assembly time in manufacturing systems are analysed, the precedence diagram model for the above assembly line is built and the effects of factors on the line balancing problem are considered. Lastly, the balancing results of the deterministic model are compared to the real world data from industries for the effective usage of the altered model.
机译:影响组装线性能的因素很难通过数学模型进行评估和解决。这项研究试图为随机的汽车仪表板装配线平衡问题提供一种实用的解决方案。分析了影响制造系统装配时间的因素,建立了上述装配线的优先级图模型,并考虑了因素对生产线平衡问题的影响。最后,将确定性模型的平衡结果与来自行业的真实世界数据进行比较,以有效使用更改后的模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号