首页> 外文期刊>Pipe Line & Gas Industry >New test facility offers gas turbine meter calibration
【24h】

New test facility offers gas turbine meter calibration

机译:新的测试设施可对燃气涡轮流量计进行校准

获取原文
获取原文并翻译 | 示例
           

摘要

A new high-pressure test facility has been built for calibrating ANSI Class 300 and 600 gas turbine meters, at pressures between zero and 1,000 psig, for meter sizes ranging from 3 to 8 in.The facility was built by the American Meter, Co. to help gas transmission and distribution companies reduce the measurement uncertainty often associated with gas turbine meters, especially when operated at pressures different from calibration pressures. Two buildings comprise the test facility:· A high-pressure test facility in Corry, Pennsylvania· A low-pressure test facility in Erie, Pennsylvania.
机译:新建了高压测试设备,用于校准ANSI Class 300和600燃气轮机仪表,压力范围为0至1,000 psig,仪表尺寸为3至8 in。为了帮助天然气输送和分配公司减少通常与燃气轮机表相关的测量不确定性,尤其是在与校准压力不同的压力下运行时。测试设备由两座建筑物组成:·宾夕法尼亚州科里的高压测试设备·宾夕法尼亚州伊利的低压测试设备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号