...
首页> 外文期刊>Quality Control and Applied Statistics >Bivariate control charts with double sampling
【24h】

Bivariate control charts with double sampling

机译:双变量双变量控制图

获取原文
获取原文并翻译 | 示例
           

摘要

As in the case of Shewhart control charts, samples of size n = (n, + n 2) are taken, but in two phases. In the first phase, m items are inspected for two characterstics (x; y). If T for the mean vector of (x, y) is less than a certain W, sampling is terminated. If Tj1 > CL, (> W), an out-of-control condition is signaled; otherwise a second phase sample of n , units is drawn. Then Hotelling T2 for the entire sample is computed and used for a decision. The expressions to assess the BDS chart's performance are obtained by an appropriate axis rotation that transforms correlated variables into uncorrelated ones. (31 refs.)
机译:与Shewhart控制图一样,采样的大小为n =(n,+ n 2),但分为两个阶段。在第一阶段,检查m个项目的两个特征(x; y)。如果(x,y)的平均向量的T 小于某个W,则终止采样。如果Tj1> CL,(> W),则发出失控状态信号;否则,绘制n个单位的第二阶段样本。然后计算整个样本的Hotelling T2,并将其用于决策。评估BDS图表性能的表达式是通过适当的轴旋转获得的,该旋转将相关变量转换为不相关变量。 (31参考)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号