首页> 外文期刊>Uranium intelligence weekly >NPCIL's Fueling and Output: An Update
【24h】

NPCIL's Fueling and Output: An Update

机译:全国人大常委会的加油和输出:最新情况

获取原文
获取原文并翻译 | 示例
           

摘要

Although producers such as Cameco and Rio Tinto may be eager to join the Russians and French in supplying India with yellowcake, the mid-term demand of the current fleet of the Nuclear Power Corporation of India, Ltd. (NPCIL) is relatively spoken for. The 300 tU supplied by Areva in 2008 has fueled the Rajasthan-2 reactor, whose capacity factor increased from 73% in 2007 to 88% in 2009. By December of last year, the reactor - the oldest of the country's PHWRs still operating - was running at 97%.
机译:尽管Cameco和Rio Tinto之类的生产商可能渴望与俄罗斯人和法国人一起向印度供应黄蛋糕,但相对而言,印度核电公司(NPCIL)当前船队的中期需求却相对可观。阿海珐集团在2008年提供的300 tU燃料为拉贾斯坦2号反应堆提供了燃料,该反应堆的容量系数从2007年的73%增长到2009年的88%。到去年12月,该反应堆(该国仍在运行的最古老的重水堆)已投入使用。以97%的速度运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号