首页> 外文期刊>The Australian pipeliner >Red Gully export pipe connected to DBNGP
【24h】

Red Gully export pipe connected to DBNGP

机译:Red Gully出口管连接到DBNGP

获取原文
获取原文并翻译 | 示例
       

摘要

Works have been completed on the Red Gully Gas and Condensate Processing Facility Project with the 3 km export pipeline now connected to the Dampier to Bunbury Natural Gas Pipeline (DBNGP) inlet facility. The export pipeline to the DBNGP inlet facility has been welded in sections and at the time of writign, trenching, burying and laying of the pipeline was underway. The DBNGP inlet facility is complete to tie-in the Red Gully Export Pipeline.
机译:Red Gully气体和冷凝水处理设施项目的工程已经完成,3公里的出口管道现已连接到Dampier到Bunbury天然气管道(DBNGP)的进口设施。通往DBNGP进口设施的出口管道已分段焊接,在进行书面,挖沟,掩埋和铺设之时正在进行中。 DBNGP入口设施已完成,可以连接Red Gully出口管道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号