...
首页> 外文期刊>The Northern Miner. >Feasibility puts El Morrp price tag at US 2.5 billion dollars
【24h】

Feasibility puts El Morrp price tag at US 2.5 billion dollars

机译:可行性使El Morrp的价格达到25亿美元

获取原文
获取原文并翻译 | 示例
           

摘要

A feasibility study on the El Morro copper-gold project, in Mexico, puts average annual production at 195,000 tonnes copper and 354,000 oz. gold over the first five years of a 15-year mine life, say joint-venture partners Metallica Resources (MR-T, MRB-X) and Xstrata (XSRAF-O, XTA-L) subsidiary Xstrata Copper.The companies will finish sifting through a mountain of information from the study, contained in 75 large binders, before they decide what to do next.The study recommends the companies complete an environmental impact assessment and detailed infrastructure engineering, as well as order long-lead items during 2008.
机译:墨西哥El Morro铜金项目的可行性研究认为,铜的平均年产量为195,000吨铜和354,000盎司。合资伙伴Metallica Resources(MR-T,MRB-X)和Xstrata(XSRAF-O,XTA-L)子公司Xstrata Copper表示,在15年矿山寿命的前五年中,黄金是黄金。通过研究中包含的大量信息,这些信息包含在75种大型活页夹中,然后再决定下一步该怎么做。研究建议两家公司完成环境影响评估和详细的基础设施工程,并在2008年订购长铅项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号