...
首页> 外文期刊>Ti02 Worldwide Update >AUSTRALIA: Recapitalised & Re-equipped AZC Ramps-up Output at Mindarie
【24h】

AUSTRALIA: Recapitalised & Re-equipped AZC Ramps-up Output at Mindarie

机译:澳大利亚:在Mindarie进行资本重组和重新装备的AZC提升产量

获取原文
获取原文并翻译 | 示例
           

摘要

Australian Zircon NL (AZC) opened its Mindarie mine in mid-November 2007 and, although the ramp-up has been slower than anticipated, the company is now moving towards its Phase 1 production targets: 75,000 t.p.a. of ilmenite; 15,400 t.p.a. of rutile/leucoxene; and 43,000 t.p.a. of zircon. The Mindarie mine is located in the southern zone of the Murray Basin region, about 150 km east of Adelaide. The mineral sands separation plant is located at the minesite and from here mineral sands products are transported by rail to Port Adelaide, for onward shipment to customers. (See also TiO2 Worldwide Update, Sep/Oct 2008, page 8).
机译:澳大利亚Zircon NL(AZC)于2007年11月中旬开设了Mindarie矿,尽管增产进度比预期的要慢,但该公司目前正在朝其第一阶段的生产目标:75,000吨/年。钛铁矿15,400吨/年金红石/白二烯的;和43,000吨/年锆石Mindarie矿位于默里盆地地区的南部地区,阿德莱德以东约150公里。矿砂分离厂位于矿区,矿砂产品从这里通过铁路运输到阿德莱德港,然后再运送给客户。 (另请参见《 TiO2全球更新》,2008年9月10日,第8页)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号