首页> 外文期刊>Turbomachinery International >Russian economic crisis stalls St. Petersburg combined cycle: delayed start of new housing projects in the northwestern suburbs of St. Petersburg has slowed construction of a 900MW combined cycle to supply district heating. the economic crisis has al
【24h】

Russian economic crisis stalls St. Petersburg combined cycle: delayed start of new housing projects in the northwestern suburbs of St. Petersburg has slowed construction of a 900MW combined cycle to supply district heating. the economic crisis has al

机译:俄罗斯的经济危机使圣彼得堡的联合循环停滞不前:圣彼得堡西北郊区新住房项目的推迟启动已经减缓了900MW联合循环的建设,以供应区域供热。经济危机已经

获取原文
获取原文并翻译 | 示例
           

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号