Commissioning of CHP unit 2(HKW2) at the Altbach/Deizisau power station of Neckarwerke Stuttgart AG and initial operating experience

机译:Neckarwerke斯图加特股份公司Altbach / Deizisau电站的CHP 2号机组(HKW2)的调试和初步操作经验

获取原文
获取原文并翻译 | 示例
           

摘要

Neckarwerke Stuttgart AG have in 1994 started with the construction of the 330MW/280MW Plant HKW 2. Commissioning was reached as scheduled in September 1997 and terminated November 1997. The plant is a so-called combined-cycle unit: a conventional steam process with advanced design data (solo operation 303MW) is connected on the steam side with the heat recovery boiler of a gas turbine of latest design (64.7MW) thus reaching a design capacity of 381MW. Under all operating modes (solo operationconventional process, solo operation gas turbine, combined-cycle operation) is it possible to extract up to 280MW district heat. Experience gathered with the quite complex commissioning period and the first year of operation is outlined.
机译:Neckarwerke斯图加特股份公司于1994年开始建造330MW / 280MW HKW 2厂。该厂已按计划于1997年9月完成调试,并于1997年11月终止。该工厂是所谓的联合循环装置:一种传统的蒸汽工艺设计数据(单机运行303MW)在蒸汽侧与最新设计的燃气轮机(64.7MW)的热回收锅炉连接,因此达到了381MW的设计容量。在所有操作模式下(常规操作常规操作,燃气轮机单独操作,联合循环操作),都可以提取高达280MW的区域热量。概述了在非常复杂的调试期和运营的第一年中积累的经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号