...
首页> 外文期刊>High-Performance Composites >Proposed 2011 NASA budget cuts Moon/Mars program, favors commercial orbital scheme
【24h】

Proposed 2011 NASA budget cuts Moon/Mars program, favors commercial orbital scheme

机译:美国宇航局2011年预算案削减了月球/火星计划,赞成商业轨道计划

获取原文
获取原文并翻译 | 示例
           

摘要

The Constellation manned space exploration program, the U.S. National Aeronautics and Space Admin.'s (NASA) planned replacement for its Space Shuttle fleet, faces elimination if President Barack Obama's 2011 budget proposal is approved by the U.S. Congress. Announced in 2005, Constellation calls for a capsule-based vehicle, known as Orion, which would be launched on new Ares 1 rockets with renewed human Moon exploration as a primary goal. A heavy-lift launch vehicle, dubbed Ares 5, is to follow, designed to transport lunar cargo or mission hardware for deep-space missions, including potential visits to Mars (see "Optimizing the Ares V payload shroud," HPC November 2009 (p. 46) or visit www.compositesworld.com/go.aspx?id=86666).
机译:如果美国总统巴拉克·奥巴马(Barack Obama)的2011年预算提案获得批准,美国国家航空航天局(NASA)计划更换其星座航天飞机的星座载人太空探索计划将面临淘汰。 Constellation于2005年宣布,它要求一种名为Orion的基于太空舱的飞行器,该飞行器将在新的Ares 1火箭上进行发射,并将人类月球探测重新作为主要目标。紧随其后的是重型运载火箭,称为Ares 5,其设计用途是为执行月球货物或任务硬件而进行的深空飞行任务,包括对火星的潜在访问(请参阅HPC 2009年11月的“优化Ares V有效载荷导流罩”) 46)或访问www.compositesworld.com/go.aspx?id=86666)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号