...
首页> 外文期刊>High-Performance Composites >BIG PARTS? BIG TOOLING BREAKTHROUGH
【24h】

BIG PARTS? BIG TOOLING BREAKTHROUGH

机译:大零件?大工具突破

获取原文
获取原文并翻译 | 示例
           

摘要

The goal: Build a one-piece wind turbine blade. No adhesive lines. Molded in one shot. And with a two-thirds reduction in cycle time. Impossible? Not anymore. Not only has EireComposites Teo. (County Galway, Ireland) achieved this goal, but in developing the completely new molding solution required to process large thermoplastic composite structures at 200°C/392°F, it also has opened the door to new thermoset materials that might provide thermoplastic benefits without the cost typically associated with processing thermosets. Even better, the system promises to transcend many limitations inherent in autoclave and oven-cure processes used in the fabrication of large carbon fiber-reinforced thermoset parts in aerospace and other industrial applications.
机译:目标:构建一件式风力涡轮机叶片。没有粘合线。一杆铸模。并且将周期时间减少了三分之二。不可能?不再。 EireComposites Teo不仅如此。 (爱尔兰County Galway)实现了这一目标,但在开发在200°C / 392°F下处理大型热塑性复合材料结构所需的全新成型解决方案时,它也为新型热固性材料打开了大门,这些材料可能会带来热塑性优势而又不通常与加工热固性塑料有关的成本。更好的是,该系统有望超越在用于航空航天及其他工业应用的大型碳纤维增强热固性零件制造中所用的高压釜和烘箱固化工艺固有的许多限制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号