【24h】

An Uneasy Solution

机译:一个不安的解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

Asbestos waste is still buried and scattered throughout many of the sites of Ambler's old factories. Uprooted trees, burrowing animals, and flooding of local waterways threaten to bring it to the surface. The EPA has spent decades and more than $25 million trying to keep these threats under control at Ambler's two Superfund sites, primarily by burying the waste, layering it with a synthetic fabric to prevent upward migration, capping it all, and stabilizing the banks of the waterways. The Ambler Asbestos Piles site was removed from the Superfund list in 1996, but because asbestos is still present, the EPA reviews the property every five years. The EPA is scheduled to complete the initial cleanup phase of the Superfund process at the other site, named BoRit, in 2015. Most longtime residents expect that capping the asbestos will become the agency's long-term remedial plan for BoRit, the same approach taken with the Ambler Asbestos Piles.
机译:石棉废料仍被掩埋和散布在安布勒旧工厂的许多地方。连根拔起的树木,挖洞的动物以及当地水道的洪水威胁将其带到地面。 EPA花费了数十年的时间和超过2500万美元的资金,试图将这些威胁控制在Ambler的两个Superfund站点中,主要是通过掩埋废物,用合成纤维将其分层以防止向上迁移,将所有废物封盖起来并稳定银行的银行。水路。 Ambler石棉桩站点于1996年从超级基金列表中删除,但由于石棉仍然存在,因此EPA每五年会对其进行审查。 EPA计划于2015年在另一个名为BoRit的地点完成Superfund流程的初始清理阶段。大多数长期居民期望,限制石棉含量将成为该机构对BoRit的长期补救计划,采用的相同方法安布勒石棉桩。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号