...
首页> 外文期刊>Drilling Contractor >Pre-treating fluids with lost circulation materials
【24h】

Pre-treating fluids with lost circulation materials

机译:用失去循环的材料预处理流体

获取原文
获取原文并翻译 | 示例
           

摘要

CONTROLLING CIRCULATION loss during well construction is more than just selecting the proper type of lost circulation material (LCM). A fully engineered approach incorporates a number of planning tools, including: Borehole stability analysis; Hydraulics modeling to estimate equivalent circulating density (ECD); Drilling fluid and LCM material selection to help minimize effects on ECD. Planning should include means to provide on-site monitoring using pressure-while-drilling (PWD) and connection flow monitoring and timely application of LCM and treatments.
机译:控制井建设过程中的循环损耗不仅仅是选择适当类型的循环损耗材料(LCM)。经过全面设计的方法结合了许多计划工具,包括:井眼稳定性分析;水力学模型来估算等效循环密度(ECD);钻井液和LCM材料的选择有助于最大程度地减少对ECD的影响。规划应包括使用随钻压力(PWD)进行现场监控和连接流量监控以及及时应用LCM和处理方法的手段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号