...
首页> 外文期刊>Coal Outlook >Allegheny Energy works for re-fire of two major coal units
【24h】

Allegheny Energy works for re-fire of two major coal units

机译:阿勒格尼能源公司(Allegheny Energy)为两个主要煤炭单位的再燃工作

获取原文
获取原文并翻译 | 示例
           

摘要

Allegheny Energy, hit by accidental outages in recent months at two major coal-fired units, hopes to have those units back on-line in May and June. In its recent annual 10-K report, Allegheny said that the 570-MW coal-fired Hatfield's Ferry Unit 2 in West Virginia, hit by a fire last November, is expected back up in May. The outage is getting expensive for Allegheny. "Allegheny currently estimates that the total costs associated with the fire, inclusive of 2003 and 2004 net revenue losses, repair and replacement costs and anticipated insurance proceeds, are approximately 40 million dollars," the company said. "Allegheny continues to investigate to determine whether any other recoveries are possible."
机译:阿勒格尼能源公司(Allegheny Energy)最近几个月受到两座主要燃煤机组意外停电的打击,希望这些机组在5月和6月重新上线。阿勒格尼在最近的10-K年度报告中表示,去年11月大火袭击的西弗吉尼亚州哈特菲尔德的570兆瓦燃煤轮渡2号机组有望在5月恢复运行。对于阿勒格尼而言,停电正在变得越来越昂贵。该公司表示:“阿勒格尼目前估计与大火有关的总成本,包括2003年和2004年的净收入损失,维修和更换成本以及预期的保险收益,约为4000万美元。” “阿勒格尼继续调查以确定是否有其他可能的回收方法。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号