Coal mine methane control cost and full cost: The case of the Luling Coal Mine, Huaibei coalfield, China

机译:煤矿瓦斯控制成本与全部成本:以淮北煤田鹿岭煤矿为例

获取原文
获取原文并翻译 | 示例
           

摘要

Affected by the macroeconomic situation, the profits of Chinese coal production continue to decline. Coal mines are forced to increase their methane control investment to ensure safety in production as methane disasters are becoming more and more serious. It is necessary for coal mines to calculate the methane control cost and the full cost of each alternatives before mining to perform economic evaluations for choosing methane control measures and mining methods in such a grim climate for the coal industry. Of all the optional methane control measures and mining methods, the purpose of cost reduction in coal mines could therefore be achieved by choosing the most economical one. Based on the analysis of the methane control technologies of the second and the third level, the Luling Coal Mine in the Chinese Huaibei coalfield is taken as an example to propose a simplified method of calculating the methane control cost and the full cost before mining. In this method, the full cost is divided into the direct production cost, indirect production cost, business tariff and annex and period cost. The current methane control cost and full cost are calculated at the current price level, and then, the actual costs are calculated with a certain annual growth rate according to the engineering time. The methane control costs and the full costs of a working face in the Luling Coal Mine's second and third level are obtained, and the cost-cutting measures are provided. Despite of small economic benefit, most of the drained methane is used as domestic fuel or for electricity generation, which brings obvious environmental effects. (C) 2015 Elsevier B.V. All rights reserved.
机译:受宏观经济形势影响,中国煤炭生产利润继续下降。随着甲烷灾害越来越严重,煤矿被迫增加其甲烷控制投资以确保生产安全。对于煤矿来说,在这样严峻的气候条件下,有必要计算煤矿的甲烷控制成本和每种替代品的全部成本,然后进行经济评估,以选择甲烷控制措施和开采方法。因此,在所有可选的甲烷控制措施和开采方法中,可以通过选择最经济的方法来实现降低煤矿成本的目的。在分析第二,三级甲烷治理技术的基础上,以中国淮北煤田芦岭煤矿为例,提出一种简化的甲烷治理成本和开采前全部成本的计算方法。在这种方法中,全部成本分为直接生产成本,间接生产成本,商业关税以及附件和期间成本。以当前价格水平计算当前的甲烷控制成本和全部成本,然后根据工程时间以一定的年增长率计算实际成本。获得了Lu陵煤矿第二,三层的甲烷控制成本和工作面的全部成本,并提供了削减成本的措施。尽管经济效益不佳,但大部分排放的甲烷仍被用作家庭燃料或发电,这对环境产生了明显影响。 (C)2015 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号