...
首页> 外文期刊>Journal of Petroleum Technology >Deepwater Gas-Zone Shutoffs With Wireline in Openhole-Gravel-Pack Completions
【24h】

Deepwater Gas-Zone Shutoffs With Wireline in Openhole-Gravel-Pack Completions

机译:带有裸眼砾石充填完井的深水气层截流电缆

获取原文
获取原文并翻译 | 示例
           

摘要

An operator successfully executed two wireline through-tubing gas-shutoff (GSO) workovers in high-angle openhole-gravel-pack (OHGP) completions to isolate high-gas/ oil-ratio (HGOR) zones, resulting in significantly increased oil production. This paper summarizes the GSO concept, completion modeling, job planning, completion-equipment testing, job execution, and production results from one of these two wells (the processes and results associated with the second well are detailed in the complete paper).
机译:一名操作员成功地在高角度裸眼砾石充填(OHGP)完井中进行了两次电缆直通气关(GSO)修井,以隔离高气/油比(HGOR)区域,从而显着提高了石油产量。本文总结了这两个井之一的GSO概念,完井建模,作业计划,完井设备测试,作业执行和生产结果(完整论文中详细介绍了与第二井相关的过程和结果)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号