...
首页> 外文期刊>Journal Of The South African Institute Of Mining & Metallurgy >Ore pass rehabilitation-Case studies from Impala Platinum Limited
【24h】

Ore pass rehabilitation-Case studies from Impala Platinum Limited

机译:矿石通过修复-Impala Platinum Limited的案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

A successful mine must strive to maintain a constant level of production. To achieve this, rock broken in the workplace must be removed to surface on a continuous basis, with minimal interruption. Ore pass systems play a critical role in this process, and the integrity of the ore pass excavations is crucial to maintaining production requirements. Over the life of the mine, ore pass integrity deteriorates. Ore passes are subjected to changing stress environments as a result of mining, to wear and abrasion due to the flow of broken ore, as well as to the effect of rockwall failures around and on geological discontinuities. The resulting deterioration may result in the ore pass no longer being fit for purpose, in which case remedial measures are required.
机译:成功的矿山必须努力保持恒定的生产水平。为此,必须在不间断的情况下连续清除工作场所破碎的岩石。矿石通道系统在此过程中起着至关重要的作用,而矿石通道挖掘的完整性对于维持生产要求至关重要。在矿山的使用寿命中,矿石通过完整性会下降。由于采矿,矿石通行证承受着不断变化的应力环境,由于破碎的矿石的流动以及围岩周围和对地质不连续性的岩壁破坏的影响,矿石通行证遭受磨损。导致的变质可能导致矿石通过不再适合目的,在这种情况下需要采取补救措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号