...
首页> 外文期刊>Journal Of The South African Institute Of Mining & Metallurgy >Campaign mining set-up for waste stripping at New Vaal Colliery
【24h】

Campaign mining set-up for waste stripping at New Vaal Colliery

机译:在新瓦尔煤矿开采废料的竞选采矿设施

获取原文
获取原文并翻译 | 示例
           

摘要

The objective of the investigation is to optimize the truck and shovel operations for pre-stripping at New Vaal Colliery by introducing campaign mining. The aim of campaign mining is to improve the efficiency of the loading, hauling, dumping, and maintenance operations which are critical to the success of truck and shovel operations. The current loading (single-sided loading method), hauling, and dumping operations at New Vaal Colliery were found to be inefficient. Time studies were used as a major indicator to highlight the inefficiency of the track and shovel operations, and it is recommended that an improved loading configuration, hauling, and dumping operations be implemented by using campaign mining. It is also recommended that a service truck be used to maintain the pre-stripping fleet in order to reduce travelling times to the main workshop. As expected, the improved operating conditions will lead to an increase in pre-stripping production.
机译:调查的目的是通过引入战役采矿来优化卡车和铲子的操作,以在新瓦尔煤矿进行预剥离。运动采矿的目的是提高装载,​​运输,倾卸和维护作业的效率,这对于卡车和铲车作业的成功至关重要。发现新瓦尔煤矿的当前装载(单面装载方法),牵引和倾卸操作效率低下。时间研究被用作突显履带和铲土作业效率低下的主要指标,建议通过使用战役挖掘来实施改进的装载配置,牵引和倾卸作业。还建议使用服务卡车来维护预剥离车队,以减少前往主车间的时间。不出所料,改善的操作条件将导致预剥离的产量增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号