首页> 外文期刊>International Oil Daily >First Production Starts at Shenzi
【24h】

First Production Starts at Shenzi

机译:首次在沈子开始生产

获取原文
获取原文并翻译 | 示例
           

摘要

BHP Billiton said that first oil and natural gas production has started from its Shenzi development in the deepwater US Gulf of Mexico. The tension leg platform (TLP) has a nominal capacity of 100,000 b/d and 50 MMcf/d of natural gas, on a 100% basis. The Shenzi facility is located 120 miles off the Louisiana coastline and is installed in 4,300 feet of water on Green Canyon Block 653, making it the second deepest TLP in the world. BHP's Chief Executive Michael Yeager said the development came on stream ahead of schedule and within budget and is another important milestone.
机译:必和必拓表示,第一批石油和天然气生产是从其在深水美国墨西哥湾的深子开发项目开始的。张力腿平台(TLP)的额定容量为100b / d,100,000桶/天和50 MMcf / d。 Shenzi设施位于距离路易斯安那州海岸线120英里的位置,安装在Green Canyon Block 653的4,300英尺深的水中,使其成为全球第二大TLP。必和必拓首席执行官迈克尔·耶格尔(Michael Yeager)表示,这项开发工作提前完成并在预算之内,是另一个重要的里程碑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号