...
首页> 外文期刊>E&P daily >Malaysia platform installed
【24h】

Malaysia platform installed

机译:马来西亚平台安装

获取原文
获取原文并翻译 | 示例
           

摘要

A new wellhead platform has been installed at Newfield Exploration's West Belumut satellite development offshore Malaysia and the field remains on schedule for start-up in the fourth quarter of this year. Derrick lay barge Sapura 3000 was deployed to install the platform on location after the offshore structure was loaded out from Kencana Petroleum's shipyard in Lumut. West Belumut lies in the PM323 permit offshore Peninsular Malaysia. The block also contains the East Belumut field, which is producing at 16,000 b/d.
机译:Newfield Exploration在马来西亚近海的West Belumut卫星开发项目中已安装了新的井口平台,该油田仍按计划在今年第四季度启动。在从Kencana石油公司位于红土坎的船厂卸下海上结构后,部署了Derrick躺船Sapura 3000以将平台安装到位。西贝卢穆特(West Belumut)位于马来西亚半岛近海的PM323许可证中。该区块还包含East Belumut油田,该油田的日产量为16,000桶。

著录项

  • 来源
    《E&P daily》 |2010年第31期|共1页
  • 作者

    Eamp; P Daily group;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号