Bridge Energy has agreed a US $38.3m deal to acquire a 50% working interest in the producing UK North Sea Duart field from Nexen Petroleum. Bridge said the interest would add daily production of 750 bbl of oil to its inventories. The Duart field is located in Block 14/20 on the UK Continental Shelf. The field was developed in 2007 with a single subsea development well tied back to the nearby Talisman-operated Tartan platform. Production from Duart is processed on Tartan and co-mingled with other Tartan area production before being piped to the Flotta oil storage terminal.
展开▼