首页> 外文期刊>Cotton Reseach Journal >Gin Management Programme for Simulation of Cotton Ginning Cost: A Review
【24h】

Gin Management Programme for Simulation of Cotton Ginning Cost: A Review

机译:模拟轧花成本的轧花管理程序:综述

获取原文
获取原文并翻译 | 示例
           

摘要

The success and profitability of a ginning operation is determined by the effectiveness of its machinery maintenance programme. A comprehensive gin maintenance programme impacts safety, fibre quality, daily and annual volume, downtime energy costs andmaterial and labour maintenance costs etc. A good gin maintenance programme involves continual documentation, communication and planning. Each employ must communicate the needs and benefits of the programme. The office worker compiling the repair and downtime data, the gin crew performing the preventive maintenance and cleaning the gin, the ginner troubleshooting problems and operating the gin, the gin manager overseeing the entire operation while satisfying the customer's needs of timely, quality ginning, all must become part of the ginning process.
机译:轧花作业的成功与盈利取决于其机械维护计划的有效性。全面的杜松子酒维护计划会影响安全性,纤维质量,日产量和年产量,停机时间的能源成本以及材料和人工维护成本等。好的杜松子酒维护计划涉及持续的文档编制,沟通和计划。每个员工必须传达该计划的需求和利益。办公室工作人员会编辑维修和停机时间数据,杜松子酒工作人员进行杜松子酒的预防性维护和清洁,杜松子酒的故障排除问题和杜松子酒的操作,杜松子酒的经理监督整个操作,同时满足客户及时,优质的杜松子酒的需求,所有必须成为轧花过程的一部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号