A megawatt scale grid-connected photovoltaic power plant was commissioned on 27 December 2009 in Yalesandra in Kolar district in Karnataka. The Yalesandra plant is one among more than 20 such Megawatt size solar power plants in India during the past few years. The performance of this plant during its first year of operation has been discussed. The total electrical energy generated by the Yelasandra plant during 2010 was 3.34 million kWh. Although the performance of photovoltaic modules was good, there were problems associated with the inverters which led to reduction in energy generation. The impact of temperature variation of modules on their performance has been highlighted.
机译:兆瓦级并网光伏电站于2009年12月27日在卡纳塔克邦Kolar区的Yalesandra投入运行。 Yalesandra发电厂是过去几年印度20多家兆瓦级太阳能发电厂之一。已经讨论了该工厂运营第一年的性能。 Yelasandra电厂在2010年期间产生的总电能为334万千瓦时。尽管光伏模块的性能良好,但是存在与逆变器相关的问题,导致了发电量的减少。突出了模块的温度变化对其性能的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号