Lessons Learned Process Aligns with Project Life-Cycle, Operations and Engineering Governance

机译:汲取的经验教训过程与项目生命周期,运营和工程治理保持一致

获取原文
获取原文并翻译 | 示例
           

摘要

In 2004, a member of the project controls group within operations and engineering department of TransCanada Pipelines identified a need to develop a lessons learned (LL) database to support the LL process. Later, through (LL) database to support the LL process. Later, through a change management process, the project management office a change management process, the project management office ect control procedures in order to comply with governance targets. The LL process is part of the standard suite of project controls within the remit of the PMO. Essentially, the LL controls within the remit of the PMO. Essentially, the LL process gathers project experiences once each project phase is complete, and these experiences are then documented and can be reviewed by project managers running subsequent projects, in order to gain details from other projects so that mistakes are not repeated.
机译:2004年,TransCanada Pipelines运营和工程部门的项目控制小组成员发现,有必要开发经验教训(LL)数据库以支持LL流程。后来,通过(LL)数据库来支持LL进程。后来,通过变更管理过程,项目管理办公室进行了变更管理过程,项目管理办公室执行了控制程序以符合治理目标。 LL流程是PMO职权范围内的标准项目控制套件的一部分。本质上,LL控制在PMO的权限内。从本质上讲,LL过程在每个项目阶段完成后便会收集项目经验,然后将这些经验记录下来,并可由运行后续项目的项目经理进行审查,以便从其他项目中获取详细信息,从而避免重复犯错。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号