...
首页> 外文期刊>AACE International Transactions >Earned Value Analysis and CPM Schedule Review in Construction
【24h】

Earned Value Analysis and CPM Schedule Review in Construction

机译:施工中的挣值分析和CPM进度表审查

获取原文
获取原文并翻译 | 示例
           

摘要

This paper discusses how elements of earned value management techniques are being applied to construction projects, in conjunction with critical path method (CPM) schedule review, to measure project performance and forecast completion time and costs. This paper examines the approaches of traditional cost management compared to those of earned value management, and discusses the advantages of implementing earned value management over traditional cost management methods. We summarize how CPM schedules are reviewed and expound on how earned value metrics enhance the analysis of project performance for the benefit of the project team. This paper also highlights the added value that integrated schedule and cost reviews and analyses bring to the project in managing and mitigating risks. The objective is to demonstrate the benefits of implementing earned value analysis concurrently with CPM schedule review on construction projects, from the position of owner, contractor, and consultant. The challenges faced and the opportunities for improvement by those implementing these techniques are also addressed.
机译:本文讨论了如何将挣值管理技术的要素与关键路径法(CPM)进度审查一起应用于建筑项目,以衡量项目绩效并预测完工时间和成本。本文将传统成本管理方法与挣值管理方法进行了比较,并讨论了实现挣值管理相对于传统成本管理方法的优势。我们总结了如何审查CPM进度表,并阐述了挣值指标如何增强对项目绩效的分析,以使项目团队受益。本文还重点介绍了集成进度计划,成本审查和分析为项目带来的管理和缓解风险的附加值。目的是从所有者,承包商和顾问的位置,论证在建筑项目上执行CPM进度表审查的同时进行挣值分析的好处。还解决了实施这些技术的人员所面临的挑战和改进的机会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号