Challenges of the Measured Mile Concept for Productivity Loss Claims

机译:衡量里程概念对生产力损失索赔的挑战

获取原文
获取原文并翻译 | 示例
           

摘要

Contractors face several challenges when developing claims for productivity loss due to owner/architect/engineer or third-party interference. These include the burden of linking the interference to the productivity loss and establishing the reasonableness of estimated increased time and/or costs. AACE International describes various methodologies in its Recommended Practice No. 25R-03 for estimating lost productivity, with the most favorable being the Measured Mile. This paper discusses this methodology in which labor performance is compared between two time periods - an unimpacted period called the “Measured Mile” and an impacted period. This paper discusses the challenges in comparing Measured Mile performance criteria, including work tasks, productivity levels, worker skill levels, work scopes, and work environment. By following the guidelines outlined in this paper, contractors and claim preparers can ensure they are utilizing the best available facts and records to package their claim in an understandable and believable format to ultimately be successful in their recovery of damages.
机译:承包商在因业主/建筑师/工程师或第三方干扰而导致生产力下降的索赔提出要求时,面临着数个挑战。这些负担包括将干扰与生产力损失联系在一起并确定估计的增加的时间和/或成本的合理性的负担。 AACE International在其推荐做法25R-03中描述了各种方法来估计生产力损失,最有利的是“测量英里数”。本文讨论了在两个时间段内比较劳动绩效的方法,这两个时间段分别是未受影响的时期(称为“测量里程”)和受影响的时期。本文讨论了比较“测量英里数”绩效标准(包括工作任务,生产力水平,工人技能水平,工作范围和工作环境)所面临的挑战。通过遵循本文概述的准则,承包商和索赔准备者可以确保他们利用可得的最佳事实和记录以易于理解和可信的格式打包索赔,以最终成功地挽回损害赔偿。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号