Creating Half-Step Schedules using P6's Update Baseline Utility

机译:使用P6的Update Baseline Utility创建半步计划

获取原文
获取原文并翻译 | 示例
           

摘要

Have you ever faced the challenge of reviewing a monthly schedule update that includes both progress updates and non-progress revisions? To effectively evaluate potential schedule impacts, a schedule reviewer needs to separate the progress updates from the nonprogress revisions. Primavera P6 software contains several features that can assist in the review and analysis of project schedules; it allows the Scheduler to save copies of project schedules as "Baselines". These Baseline schedules can also be updated using the "Update Baseline" utility. In this paper, the authors' explore the Update Baseline feature, the myriad of options available, and how it can be used to review and analyze project schedules.
机译:您是否曾经面临过审查包括进度更新和非进度修订的月度计划更新的挑战?为了有效地评估潜在的进度影响,进度审查者需要将进度更新与非进度修订分开。 Primavera P6软件包含一些功能,可以帮助检查和分析项目进度表;它允许计划程序将项目计划的副本另存为“基准”。这些基准计划也可以使用“更新基准”实用程序进行更新。在本文中,作者探索了“更新基准”功能,众多可用选项以及如何使用它来检查和分析项目进度表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号