...
首页> 外文期刊>AACE International Transactions >Project Scope of Work and Cost Estimating
【24h】

Project Scope of Work and Cost Estimating

机译:项目工作范围和成本估算

获取原文
获取原文并翻译 | 示例
           

摘要

For a typical project, in oil related industry costing several hundred million dollars or a small construction project costing few thousand dollars, the need for scope of work and accurate cost estimate is essential for each project. Both entities must ensure that the completed project is in line with the agreed-upon scope of work, with minimal change orders and at a cost close to the estimate. Today's bottom-line-oriented senior project managers define success differently than did their predecessors. In order to alleviate the fear of misleading numbers in the corporate world, this paper presents a unique way of establishing the project scope of work before the start of any estimating related activity. The scope of work coupled with the availability of several cost estimating techniques and state of the art estimating tools, will ensure all project owner get what is required for cost and schedule, with few delays and within appropriated funding amounts.
机译:对于一个典型的项目,在石油相关行业中花费数亿美元,或者在小型建筑项目中花费数千美元,对于每个项目,工作范围和准确的成本估算是必不可少的。两个实体都必须确保完成的项目符合商定的工作范围,并以最少的变更单和接近估算的成本进行。如今,以底线为导向的高级项目经理对成功的定义与他们的前任不同。为了减轻对企业界误导性数字的恐惧,本文提出了一种在进行任何估计相关活动之前确定项目工作范围的独特方法。工作范围以及几种成本估算技术和最先进的估算工具的可用性,将确保所有项目所有者都能获得所需的成本和进度,几乎没有延迟,并且在适当的资金额度内。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号