Situated on riverbanks, three communities of Matina Crossing Federation (Matina Fed) in Davao City, Mindanao have to rely on bamboo makeshift bridges for their access to the main street. The makeshift bridge is unsafe and flushed away each time the river floods. Nevertheless, the municipality was reluctant to replace the bridge due to the informal status of residents' land tenure.On November 2009 Matina Fed expressed their wish for a replacement bridge and started a savings group with guidance from the Homeless People's Federation Philippines Inc. (HPFPI). During a design workshop in February 2010 the challenge was shared with "community architects" from countries in the region. The replacement bridge will also be bamboo, but new technologies will be incorporated. Further, the Matina Crossing Federation took the lead in activities related to the project; on administration,-materials procurement, mobilization for labor and food, and on hosting related workshops.In April 2011 two Indonesian bamboo carpenters stayed in the community and led the construction of the bridge. In one month the entire bamboo structure is completed. Another month was needed for roofing and mortar injection. Finally, four-inch thick concrete was poured for the floor. The 23 m span bamboo bridge was completed with cost of PHP 450.000 (around USD 10.000) that is paid by loans. In June 2011 a devastating flash-flood carried debris which battered the bridge. The bridge survived, and even served as a safety platform. The bridge continues to serve the communities for more than two years up to the time this is written.
机译:位于达沃市的Matina Crossing Federation(Matina Fed)的三个社区位于河岸,棉兰老岛必须依靠竹临时桥梁来获得主要街道。临时桥梁每次河流洪水都是不安全的,并冲走。尽管如此,由于居民土地居民的非正式状况,该市不愿意取代这座桥。2009年11月Matina Fed表示他们对替代桥的愿望,并开始储蓄小组与无家可归者联邦菲律宾公司的指导(HPFPI )。在2010年2月的设计研讨会期间,挑战与该地区各国的“社区建筑师”共享。替代桥也将是竹子,但新技术将被纳入。此外,Matina Crossing联合会在与项目有关的活动中夺取了铅;在行政管理下, - 各材料采购,劳动力和食品的动员,以及举办相关研讨会。2011年4月两名印度尼西亚竹木匠留在社区,并导致了桥梁的建设。在一个月内完成整个竹结构。屋顶和砂浆注射需要另一个月。最后,为地板倾吐了四英寸厚的混凝土。 23米跨度竹桥完成了PHP 450.000(约10.000美元)的费用,该贷款支付。 2011年6月,一个毁灭性的闪蒸携带碎片,碎桥。这座桥幸存下来,甚至是安全平台。这座桥继续为社区服务超过两年的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号