首页> 外文期刊>Beekeeping >Going With the FlowPart 6: First Inspection
【24h】

Going With the FlowPart 6: First Inspection

机译:与Plowpart 6:第一次检查

获取原文
获取原文并翻译 | 示例
           

摘要

It's my first inspection. I want to do it alone, so during the week I drive to the Apiary after work. It's a good night to do it as the weather is nice and calm.The first thing to say is that there are loads of bees zipping in and out of my hive, so I know they are OK. I get to work quickly. There's no super at this stage,so I undo the two screws either side of the roof that keeps it from blowing off and put it to one side. The roof is pitched, so I place the apex towards the ground between two concrete blocks to keep it level and easy to place anything on top. The crownboard is placed on top of the roof. There's no Queen excluder at this point, as there's no need.
机译:这是我的第一次检查。 我想独自一人,所以在一周内,我在工作后开车到蜂房。 这是一个美好的夜晚,因为天气好,平静。首先要说的是,有大量的蜜蜂在我的蜂巢中抽出,所以我知道他们还可以。 我快点工作。 在这个阶段没有超级阶段,所以我撤消了两个螺钉的屋顶的两侧,使其能够吹掉并将其放在一侧。 屋顶被倾斜,所以我将顶点放在两个混凝土块之间的地面,以保持IT水平且易于在顶部放置任何东西。 将主盖放在屋顶的顶部。 此时没有女王排除,因为没有必要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号