...
首页> 外文期刊>AACE International Transactions >Challenges in Camp Optimization for Mega-Projects
【24h】

Challenges in Camp Optimization for Mega-Projects

机译:大型项目营地优化挑战

获取原文
获取原文并翻译 | 示例
           

摘要

Previous research related to the camp cost on remote mega-projects is intended to minimize the owner's overall camp cost by reducing the workforce (manpower) loading peaks. Resource leveling and smoothing techniques using Oracle? Primavera P6 are generally applied. Innovative "hoteling" strategies have also been proposed to rotate workforce shifts and reduce camp room demand. As an extension, the current paper describes in detail the components that make up a megaproject's workforce accommodation cost. Experienced industry experts were interviewed; their perspectives, recommendations and lessons learned provide the insight for the present study. A case study of planning workforce accommodation is presented with the intent to reveal inadequacies in current practice. Finally, the need for further research and improvement is identified. The findings can specifically lend decision support to Owner Companies in achieving cost effective management of workforce accommodation on remote mega-projects.
机译:以前与远程MEGA-PROJECTS上的营地成本相关的研究旨在通过减少劳动力(人力)加载峰值来最大限度地减少所有者的整体营地成本。使用Oracle资源调平和平滑技术?通常施加Primavera P6。还提出了创新的“酒店”策略来旋转劳动力转变,并降低营地需求。作为扩展,目前的论文详细介绍了构成Megaproject的劳动力住宿费用的组件。经验丰富的行业专家进行了采访;他们的观点,建议和经验教训提供了本研究的见解。对规划劳动力住宿的案例研究,意图揭示了当前实践中的不足。最后,确定了进一步研究和改进的需求。这些调查结果可以专门为业主公司提供决策支持,以实现在远程大型项目上实现劳动力住宿的成本效益管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号