Performing Schedule Analysis and Productivity Using Linear Scheduling

机译:使用线性调度执行计划分析和生产率

获取原文
获取原文并翻译 | 示例
           

摘要

The increase in complexity of modern construction has escalated the importance of scheduling as a project controlling and monitoring tool. A well planned, expertly managed, and realistic resource-loaded schedule provides the best means to identify issues with the potential to affect the successful completion of a project. An analyst, performing comparisons against such a baseline schedule, will identify potential problems and discern a project's true health. Additionally, projects are best managed when they benefit from the efficient use of resources and increased productivity. Effective visual communication is critical to the demonstration and understanding of these schedule processes. This paper discusses the use of linear scheduling method using time-location planning software to perform resource and production based schedule analysis for construction projects. Through this tool, an analyst will be able to examine the results and apply them to the project plan for the best possible mix of resource efficiency and project time of completion.
机译:现代建设复杂性的增加升级了调度作为项目控制和监测工具的重要性。计划良好的,专业管理和现实的资源加载的时间表提供了识别可能影响项目成功完成的可能性的最佳手段。对这种基线时间表进行比较的分析师将确定潜在的问题并辨别项目的真实健康。此外,项目最佳管理,当他们受益于资源的有效利用和提高生产力时。有效的视觉通信对对这些计划流程的示范和理解至关重要。本文讨论了使用时间位置计划软件使用线性调度方法对建设项目进行资源和生产的进度分析。通过此工具,分析师将能够检查结果并将其应用于项目计划,以获得资源效率和项目的项目时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号